Engineering – Rail

• Constructability Reports and Construction Staging Diagrams as part of the TfNSW Concept Design;
• Compilation of Sydney Trains Possession Configuration and Possession Calendar information required for detailed project review at Construction Staging Workshops; and
• Assisted with submission of Electrical Operating Diagram Advice of Alteration(s).

Undertaken work for various clients, including the following projects:

HEAVY RAIL

• Parramatta Turnback Project
• Western Sydney Rail Upgrade
• Clyde Junction Project: Stage 12 Project at Auburn NSW / Stage 13 at Clyde and Granville NSW.
• North Strathfield Rail Underpass Project.
• Sydney Rail Futures (SRF) Stage 2 (2019-2025 Projects)
• Northern Sydney Freight Corridor Program: Rhodes to West Ryde Quadruplication, Project definition design / Berowra to Hawkesbury River Triplication, Project definition design.
• Northern Sydney Freight Corridor Program: Stage 2 - Lower Main North Quadruplication Lite - Up Relief Extension [NSRU Alliance]
• Wyong station upgrade & NIF
• NIF SSEW Program (20 Stations)
• Kiama to Bomaderry Upgrade

METRO - Sydney Metro City & Southwest [Aecom/PB/Cox/Hassell]
• Northern Corridor System Wide
• Central Station: Footbridge, Sydney Yard Access Bridge (SYAB), Northern Entry
• Bankstown Line: Bankstown, Belmore, Campsie, Dulwich Hill, Punchbowl - Punchbowl Stabling, Sydenham, Hurlstone Park, Lakemba, Marrickville, Canterbury, Wiley Park

LIGHT RAIL
- Inner West Light Rail
- Canberra Light Rail
- Parramatta Light Rail

STABLING YARDS
• Cudgegong SMTF
• South Eveleigh Intercity Service Centre
• Hornsby Planning Services, Hornsby Junction Remodelling
• Regional Stabling Options [CARDNO]

ELECTRICAL
• Substations: Chalmers Substation / Guildford Substation [BECA]
• ARTC OHW removal POD

TAP (TRANSPORT ACCESS PROGRAM)
• Arncliffe Pedestrian Access Project

SIGNALLING

• Granville to Westmead Resignalling

TUNNELS

• Sydney Metro
• Cross River Rail (Brisbane)

 

 

 

 

 

 

2018

  • Brisbane - Brisbane Live Arena, Constructability Review
  • Brisbane, CRR - Nothern and Southern Portals, Constructability Review
  • Brisbane, CRR - Mayne Yard Remodelling
  • Perth - Claremont Station, Constructability Review
  • Sydney, Metro - Sydenham Stabling, Constructability Review
  • Sydney, TfNSW - Westmead Overbridge Options, Strategic Cost Estimate and Construction Report
  • Sydney Gateway
  • T4 Upgrade Constructability Consultant
  • Inland Rail – Workforce Planning
  • Emu Plains Noise Wall Trial
  • Services impact on Commercial Development Sites

2012 - 2017

  • PLR Constructability Advisor
  • SWCSW – SMTF Expansion Cudgegong Rd
  • I&S Kiama – Bomaderry scope development
  • Canberra Light Rail Phase 2
  • NIF Ancillary Works Staging Review
  • NIF Constructability
  • Wyong & NIF
  • OHW Removal Support PBRL
  • AEC Macarthur Development
  • Thornleigh to Hornsby Third Track
  • Illawarra Corridor Study
  • Western Sydney Freight Initiatives
  • Parramatta Turnback Project
  • South Eveleigh Intercity Service Centre
  • Hornsby Planning Services
  • Regional Stabling Options
  • Technical Advisor Support for Substations
  • Sydney Metro - City and Southwest
  • Sydney Rapid Transit
  • SRF Stage 2

Cross River Rail, Brisbane

Cross River Rail will unlock a bottleneck at the core of Brisbane transport network that will allow more trains to run more often and that will integrate with new busways and new roads to provide a ‘turn-up-and-go’ transport system for the whole of South East Queensland.

Five new, high-capacity stations at inner-city locations will also provide direct access to more places of work, study and recreation.

Sydney Metro

Sydney Metro is a future automated rapid transit system in Sydney, New South Wales, Australia. Sydney will be the first Australian city to build a metro system.

Owner: Transport for NSW (through RailCorp)

 

Services: Constructability Advisor, Staging Coordinator, Construction Methodology Review